Water By Design banner image
 
 
WSUD Resources for Different Development Stages

From idea to final built form, urban development typically passes through four stages:

  1. Concept planning and preliminary lot layout
  2. Final lot layout and conceptual design
  3. Detailed design
  4. Construction, operation and maintenance

Tools and resources to assist in each of these stages of the development process are given below. Note that this list of resources is not exhaustive. Some of the listed documents will be updated from time to time. You are responsible for ensuring that you are using the most up-to-date version.

Stage 1: Concept planning and preliminary lot layout

Task

Tools and Resources

Available From

Understanding WSUD principles and concepts

Australian Runoff Quality

www.arq.org.au

Fact Sheet: An Introduction to Water Sensitive Urban Design in South East Queensland

www.healthywaterways.org

Water by Design website

www.healthywaterways.org

Determining appropriate buffer widths to existing waterways

Local government codes and policies

Relevant local government

Allocating space for stormwater treatment devices

Gold Coast City Council Conceptual Design Guidelines


Water Sensitive Urban Design Technical Design Guidelines

www.goldcoast.qld.gov.au

www.healthywaterways.org/ wsud_technical_design_guidelines.html

Fact Sheet: Planning and Designing Water Sensitive Urban Development

(Coming soon from Water by Design)

Assessing fit-for-purpose use options for recycled water

Queensland Guidelines for the Safe Use of Recycled Water

www.epa.qld.gov.au

Assessing flood and drainage impacts

Local flood investigations or drainage strategies

Relevant local government

Queensland Urban Drainage Manual

Department of Natural Resources and Water

Australian Rainfall & Runoff

www.arq.org.au

Stage 2: Final lot layout and conceptual design

Task

Tools and Resources

Available From

Determining design objectives and water quality objectives for WSUD

Draft Implementation Guideline No.7


A report providing technical details of studies undertaken to develop the suite of proposed design objectives for WSUD in SEQ can be accessed at:


Local government codes and policies

www.healthywaterways.org


www.healthywaterways.org


Relevant local government

Design of modified waterways

Brisbane City Council Natural Channel Design Guidelines, 2000

Brisbane City Council ph. 3403 8888

Selecting appropriate treatment devices in a treatment train

Australian Runoff Quality

www.arq.org.au

Melbourne Water WSUD website, Selecting a Treatment

http://wsud.melbournewater.com.au/

Water Sensitive Planning Guide and Practice Notes for the Sydney Region

http://www.wsud.org/planning.htm

Conceptual design and sizing of treatment devices to meet objectives

MUSIC model software

www.toolkit.net.au

BCC Pollutant export modelling guidelines

GCCC Music model guidelines

Brisbane City Council ph. 3403 8888

Gold Coast City Council ph. 5582 8211

Stage 3: Detailed design

Task

Tools and Resources

Available From

Estimation of stormwater flow rates

Queensland Urban Drainage Manual

Department of Natural Resources, Mines & Water

Australian Rainfall & Runoff

www.arq.org.au

Detailed design of stormwater pipe systems

Queensland Urban Drainage Manual

Department of Natural Resources, Mines & Water

Detailed design of stormwater treatment devices

Water Sensitive Urban Design Technical Design Guidelines

www.healthywaterways.org/ wsud_technical_design_guidelines.html

Preparation of engineering drawings for WSUD elements

Gold Coast City Council Standard Technical Drawing

http://www.goldcoast.qld.gov.au/

Stage 4: Construction, operation and maintenance

Task

Tools and Resources

Available From

Erosion and sediment control plan for construction phase

Best practice guidelines for the control of stormwater pollution from building sites.

Relevant local government or Healthy Waterways www.healthywaterways.org/

Soil Erosion and Sediment Control, Engineering Guidelines for Queensland Construction Sites, 1996.

Engineers Australia, Queensland Division ph. 3832 3749

Performance monitoring requirements

Local government codes and policies

Relevant local government

Maintenance checklists for stormwater treatment devices

Water Sensitive Urban Design Technical Design Guidelines

www.healthywaterways.org/ wsud_technical_design_guidelines.html